This new 23.5 m B Double was developed to achieve accessibility and manoeuvrability into tight access points.
The outcome was a unit that met the same swept path as a 19m B Double and with an increased payload of a 25m B Double.
This new 23.5 m B Double was developed to achieve accessibility and manoeuvrability into tight access points.
The outcome was a unit that met the same swept path as a 19m B Double and with an increased payload of a 25m B Double.